- Project manager for numerous environmental assessment/regulatory approvals projects, from small scale screenings to large, multi-year projects in remote areas involving hundreds of staff and multi-million dollar budgets, including:
- Lake Manitoba and Lake St. Martin Outlet Channels Project, involving two 24 km channels to provide flood protection in the Lake St. Martin area of Manitoba
- Wuskwatim Generating Station, a 211 MW generating station built on the Burntwood River in northern Manitoba
- Keeyask Generating Station, a 695 MW generating station being built on the Lower Nelson River in northern Manitoba
- Conawapa Generating Project, a 1,485 generating station that was planned for the Lower Nelson River in northern Manitoba
- Birtle Transmission Project, a 60 km 230 kV transmission line in southwestern Manitoba
- Poplar Bluff Transmission Project, a 16.5 km 230 kV transmission line in southwestern Manitoba
- Pointe du Bois Spillway Replacement Project, for a 75 MW generating station on the Winnipeg River in southeastern Manitoba
- Pan Am Games Sailing Marina, in Gimli Manitoba
- Health Care facility in the Roseau River First Nation IR